Blog · Bathrooms
By Wise Build Byron · October 2026
A mid-range bathroom renovation in Byron Bay typically costs between about $21,000 and $37,000 in 2026. A basic update that keeps the same layout can start from around $10,500, while premium bathrooms with custom joinery and high-end fittings often run from $37,000 to $58,000 or more. Most full renovations take three to six weeks on site.
| Level | Guide price | What it usually means |
|---|---|---|
| Basic | $10,500 to $21,000 | Same layout, standard tiles and fittings |
| Mid-range | $21,000 to $36,750 | Full strip-out, quality tiles and tapware, frameless screen |
| Premium | $36,750 to $57,750 | Custom vanity, freestanding bath, designer finishes |
| Luxury | $57,750 to $84,000 | Larger or reconfigured rooms, top-end everything |
Byron Bay guide prices for 2026 from What's The Damage. Every bathroom is different, so an onsite quote is the only way to get an exact figure.
A small ensuite with a full strip-out and the same layout usually lands between about $15,750 and $31,500.
Typical Byron Bay costs for the main parts of a bathroom renovation:
Tapware, electrical work and painting are on top. Labour usually makes up 40 to 50% of the total, and it's smart to keep 10 to 20% aside for surprises, like damaged floor framing once the old tiles come up.
NSW still uses the 2022 National Construction Code. Under it, if your bathroom has a floor waste, the whole floor must be waterproofed, not just the shower. Shower walls must be waterproofed to at least 1800 mm high, to the Australian Standard AS 3740. In NSW, waterproofing is licensed trade work when the job is worth more than $5,000.
Sources: ABCB Housing Provisions Part 10.2; NSW Government, Waterproofing work.
Plumbing and electrical work must always be done by a licensed tradesperson in NSW, whatever the cost.
Any job over $5,000 needs a written contract. Over $20,000, your builder must give you a home building compensation insurance certificate before taking a deposit, and the deposit can't be more than 10%. Our guide to choosing a builder in the Northern Rivers covers this in more detail.
Most bathroom renovations in NSW are exempt development, so they don't need council approval, as long as you don't change the layout of the room (for example, moving or removing a wall) or reduce windows needed for light and ventilation. Moving a wall means you'll need a complying development certificate or a development application. In a strata building, you'll also need approval from the owners corporation.
Source: HIA, Are bathroom and kitchen renovations exempt development?
Waterproofing needs to cure for 24 to 48 hours before tiling starts. Custom vanities and special-order tiles can take several weeks to arrive, so it pays to choose them early.
About $15,750 to $31,500 for a full strip-out that keeps the same layout.
Usually not. Most bathroom renovations are exempt development if the room layout stays the same. Moving or removing a wall needs a complying development certificate or a development application.
If the bathroom has a floor waste, yes. Under the 2022 National Construction Code used in NSW, the whole floor must be waterproofed, not just the shower area.
Most full bathroom renovations take three to six weeks on site, depending on size and finishes.
Tiling and plumbing. Together they make up roughly 40% of a typical mid-range bathroom.
Wise Build renovates bathrooms across Byron Bay, Mullumbimby and the Northern Rivers. Call Trent on 0488 551 377 or send us a message for an onsite quote.
Get a quoteRead next: How much does a kitchen renovation cost in the Northern Rivers? · All blog posts