If your Northern Rivers home flooded in 2022, you have two main ways to protect it next time: raise it above the flood level, or retrofit it with materials that survive water and clean up fast. Homeowners already in the NSW Resilient Homes Program have until June 2027 to lodge a building scope of works, and all works must be finished by December 2028.
| Option | What it means | Best suited to |
|---|---|---|
| House raising | Lifting the home onto new, taller posts or piers so living areas sit above the flood level | Timber-framed homes on stumps or piers |
| Flood-resilient retrofit | Rebuilding the lower parts with water-resistant materials and raising services | Homes that can't easily be raised, such as brick or slab-on-ground |
| Rebuild | Replacing the home with a new, flood-resilient design | Homes too damaged or unsuitable to raise |
An engineer and your builder will confirm which suits your home. Your council's flood planning level sets how high living areas need to sit.
The Resilient Homes Program, jointly funded by the Australian and NSW governments, helps eligible flood-affected homeowners in seven Northern Rivers council areas, including Byron, Ballina, Lismore and Tweed, to raise, retrofit, rebuild or relocate their homes. As of September 2026:
If you're in the program and need a builder to prepare your scope of works, get in touch early. The program team can be reached on 1800 844 085.
Wise Build has been rebuilding Northern Rivers homes since the 2022 floods. One local homeowner wrote: "Trent and his team worked on my house after the Northern Rivers flood in 2022." They found the team professional, knowledgeable and well connected with local trades, and went on to hire Wise Build for their house raising project.
Most timber-framed homes on stumps or piers can be. Brick and slab-on-ground homes are much harder and are often retrofitted or rebuilt instead. An engineer will confirm.
New applications have closed. If you're already in the program, you have until June 2027 to submit your scope of works and until December 2028 to finish the work.
Yes. House raising needs approval, through a development application or, in some cases, a complying development certificate. We'll work out the right pathway with you.
Usually not during the lift and while services are disconnected. We'll give you a realistic timeline before work starts.
A standard repair puts back what was there. A flood-resilient repair uses materials and layouts that survive the next flood with less damage and a faster clean-up.